Priya N.
The 3D walk-through sold us. What they showed on the screen is what is in our yard now, down to the tile. Finished two days early.
Scottsdale, Arizona · Since 2009
We design your yard in 3D, put one fixed price in writing, and build it with our own crews. Most owners are swimming about 12 weeks after the dig.
Licensed, bonded, insured
AZ ROC dual license, residential and commercial
3D design before you sign
Walk your yard on screen, to scale, with real materials
One fixed price
Written quote. No change orders unless you change the plan
Our own crews
Excavation, steel, tile and plaster on our payroll
Lifetime shell warranty
Plus 3 years on equipment and 2 on finishes
Pick a shape and what goes around it. The drawing and the price update as you go.
Every plan includes entry steps, LED lighting, a variable‑speed pump and app control.
Estimated investmentSample pricing
Build time
Geometric 15 x 30 with raised spa, Baja shelf and travertine deck.
Estimated investment $111,500 to $126,500. Build time 11 to 13 weeks.
Or talk it through: (480) 555-0109
Most yards need more than a pool. We design the water, the shade, the kitchen and the ground between them as one project, on one schedule.
Sample pricing

104 degrees on one side, 45 on the other, ten steps from the back door.
See spas and cold plunges

Cook, plate and pour outside, with nothing carried from the house.
See outdoor kitchens

The ground between everything, done so it stays flat and cool.
See pavers, turf and fireYou get a dated schedule at signing and a photo update every Friday. Here is each step, and the one thing it needs from you.
Day 1
A designer measures the yard, checks access and utilities, and asks how you want to use the space.
Your part: 60 minutes at your house
Week 1
You walk the model on screen. We adjust it live until the design and the number both work.
Your part: One 45 minute review
Weeks 2 to 5
Engineering, city permit and HOA submittal are prepared and filed by our office.
Your part: Nothing. We handle it
Weeks 6 to 7
Excavation takes a day or two. Steel, plumbing and electrical follow, then the city inspects.
Your part: Unlock the side gate
Weeks 8 to 11
Shotcrete cures while tile, coping, deck, kitchen and shade structures go in around it.
Your part: Pick your tile in person
Weeks 12 to 13
Interior finish goes on, the pool fills, and we teach you the app and the equipment at the water.
Your part: Bring a swimsuit
After week 13
Then it is yours. We come back at 30 days to check the finish, the water and the equipment. The shell is covered for life.
Price your yard

I set tile on other builders' pools from 2003. I kept getting called back to the same yards to fix waterlines that had lifted and shells that had cracked. Good tile was going onto work that would not last.
In 2009 I founded Ninefoot to build the whole pool with one crew, from the first stake to the last tile. The name is the deep end of the first pool I ever tiled.
If I would not sign the tile, we do not fill the pool.
Today there are 38 people on payroll and no subcontracted shells. I walk every yard before plaster goes on. When the waterline is right I sign a tile, and only then do we fill.
Dana ReyesFounder, Ninefoot Pools
Eight backyards we finished in the last twelve months. Open any photo for a closer look.
Designed, permitted and built by our own crews. These are eight of the 640+ backyards we have finished since 2009.
Price one like thesePriya N.
The 3D walk-through sold us. What they showed on the screen is what is in our yard now, down to the tile. Finished two days early.
Tom G.
Hillside lot, three other builders passed. Ninefoot brought an engineer to the first meeting and gave us one fixed price. It held.
Elena R.
They hit rock on day one and it cost us nothing extra because it was already in the quote. The crew swept the street every single night.
Marcus D.
Our 1994 pool looks brand new. They sent photos of every crack they repaired before the new finish went on. No guessing.
Hannah S.
Weekly updates every Friday with photos and what is next. I never once had to call to ask where things stood.
Jordan K.
They mapped our septic field and saved two saguaros we assumed would have to go. The cold plunge gets used every morning.
Pool rules
No running. No diving in the shallow end. No surprise change orders.
Every crew starts the day at our Scottsdale yard. Pick your city to see the drive, what we have built there and who handles the permit.
Pick your city
City 01 of 12
Home base. North Scottsdale lots often hit caliche at three feet, so we price rock excavation up front instead of as a surprise.
City of Scottsdale pool permit and barrier inspection handled in house.
Pools in ScottsdaleCall or text the office
(480) 555-0109Text Ninefoot
A person at our office answers, Mon to Fri 7 to 5.
Ask about a pool, a remodel or a quote. Someone at the front desk reads every message and texts you back from (480) 555-0109, usually within the hour.